Engineering Project Summary

Information about Engineering Projects is provided with the latest updates available. Please contact the Engineering Department at (727) 562-4750, if more information is required.

General Information:
Project Status: In Construction Phase
Project Title: Reverse Osmosis Plant #1 Expansion
Project Number: 09-0018-UT
Project Location: 1657 Palmetto Street (Plant) and various streets between Plant #1 and Plant #2 (pipelines)
Project Description: Expansion of the existing water treatment plant from 3 million gallons a day to 4.5 million gallons per day, two new ground storage tanks and pipelines from Water Plant #1 to Water Plant #2
Project Manager: Mrs. Lan-Anh Nguyen, P.E.
Consultant: CDM Smith
Contractor: S.L. Williams (pipelines), Brandes (plant)
Project Notes: n/a
Anticipated Schedule:
Design Phase: Bid Phase: Award
Date:
Construction Phase:
Start: End: Start: End: Start: End:
9/24/2010 11/1/2012 4/27/2012
(pipelines),
10/12/2012
(Plant)
5/24/2012
(pipelines),
11/13/2012
(Plant)
7/19/2012
(pipelines),
12/7/2012
(Plant)
8/23/2012
(pipelines),
1/14/2013
(Plant)
8/23/2013
(pipelines),
9/15/2014
(Plant)