Engineering Project Summary

Information about Engineering Projects is provided with the latest updates available. Please contact the Engineering Department at (727) 562-4750, if more information is required.

General Information:
Project Status: In Construction Phase
Project Title: Brackish Reverse Osmosis Plant #2
Project Number: 10-0039-UT
Project Location: Plant is at 21133 US 19N, wells and pipelines through southern Clearwater
Project Description: Design and construction of a new brackish water well field, new Brackish Reverse Osmosis Water Treatment Plant that will produce 6.25 million gallons of drinking water per day and a deep injection well to dispose of brine.
Project Manager: Rob Fahey, P.E.
Consultant: Reiss Engineering (Plant and pipelines), SDI (wells), Leggette, Brashears and Graham (Injection Well)
Contractor: Southeast Drilling (wells and wellheads), Applied Drilling (Injection well), TBD (pipes), TBD (plant)
Project Notes: n/a
Anticipated Schedule:
Design Phase: Bid Phase: Award
Date:
Construction Phase:
Start: End: Start: End: Start: End:
9/23/2010
(wells);
9/23/2010
(Injection well);
11/16/2010
(pipes & plant)
8/3/2012
(wells);
3/1/2013
(Injection well);
12/7/2013
(pipes & plant)
8/6/2012
(wells);
3/4/2013
(Injection well);
12/10/2013
(pipes & plant)
11/15/2012
(wells);
4/5/2013
(Injection well);
3/12/2013
(pipes & plant)
12/7/2012
(wells);
4/18/2013
(Injection well);
3/21/2013
(wellheads);
4/4/2013
(pipes);
4/4/2013
(plant)
1/21/2013
(wells);
5/13/2012
(Injection well);
5/6/2013
(wellheads);
5/13/2013
(pipes);
5/6/2013
(plant)
11/17/2013
(wells);
10/10/2013
(Injection well);
10/31/2014
(wellheads);
11/6/2014
(pipes);
2/13/2015
(plant)