Engineering Project Summary

Information about Engineering Projects is provided with the latest updates available. Please contact the Engineering Department at (727) 562-4750, if more information is required.

General Information:
Project Status: In Bid Phase
Project Title: Greenlea-Otten Traffic Calming; Otten Street Stormwater Improvement Project
Project Number: 10-0003-EN
Project Location: Keene Road to Kings Highway; Sunset Point Road to Linwood Drive
Project Description: Traffic Calming and Stormwater Improvement on Otten Street
Project Manager: Himanshu Patni, PE
Consultant: Sam Swartz
Contractor: TBD
Project Notes: n/a
Anticipated Schedule:
Design Phase: Bid Phase: Award
Date:
Construction Phase:
Start: End: Start: End: Start: End:
3/01/2010 Aug 2015 Feb 2016 Feb 2016 Apr 2016 May 2016 TBD